Before You Pull Your Own Permit This Fall.

  • Writer: Mike Smith
    Mike Smith
  • Aug 27
  • 3 min read
Wood-framed house under construction behind a chain-link fence with a warning sign posted at the site
Troy Mortier / Unsplash

It’s the last week of August, which around here means two things: the humidity is still sitting on the porch, and somebody is offering to “get you in before winter.”


The pitch is almost always the same: they can start next week, they know a framer, and they’ll save you the markup. There’s just one catch: you pull the building permit.


In Johnson City, Kingsport, or Bristol, put the coffee down.


The owner-builder permit trap in Tennessee


Tennessee does let an owner-occupant of a single-family house act as their own builder — once every two years, for a house you will live in, not flip, lease, or rent. Johnson City’s homeowner affidavit (revised May 2025) and Kingsport’s affidavit both cite T.C.A. § 62-6-103 for that. Both also say anyone you hire is not exempt. You do not get to launder an unlicensed crew through your name.


That is the trap. Those affidavits exist to warn homeowners about operators who tell you to pull the permit so they can dodge licensing, insurance, liens, and code. When you sign that form, you are the general contractor — including workers’ compensation and general liability. If somebody falls off your roof, it is not a paperwork problem. It is your problem.


I wrote about this years ago because I watched a friend try to save money by hiring the trades himself. Good references. Some were not licensed. The framer had no workers’ comp. A carpenter got hurt, sued the homeowner, and won. I still ask: Do you have the time to be on site? The patience for the domino effect when one trade is late? The temperament to hold people accountable — including friends? And the insurance to survive a bad day?


Who should pull the building permit in Johnson City, Kingsport, and Bristol


If you are hiring a contractor, they should pull the permit. Kingsport says that outright: you may buy the permit yourself only if you own and occupy the house and you are doing the work. Bristol is blunter: the permit has to be in hand before work starts, ask to see a copy, and starting without one doubles the fee.


A permit is not a permission slip to begin demolition on Saturday. Johnson City requires a site drawing for new homes and additions — including decks and covered porches — and reviews those drawings against adopted codes on paper. Bristol requires a scaled site plan and drawings for new work and additions. Skip that, and you can end up paying for drawings twice, plus a fine. “My brother-in-law knows what he’s doing” is not a code section.


Two checks before you hire a contractor


Verify the Tennessee contractor license


Write the number down and look it up at verify.tn.gov, or call the Board for Licensing Contractors at 1-800-544-7693. Tennessee requires a state contractor’s license once the job — labor and materials — hits $25,000. That is the Board’s rule, not a Kingsport or Bristol local invention. Johnson City does not print the dollar figure on its public pages, but the state threshold still applies there, and the city still wants a licensed, bonded contractor plus its own local paperwork. Under that number you still need local licenses, bonds, and insurance, and the trades are separately regulated. In Johnson City, an owner-occupant can sit a free competency exam for some electrical or plumbing work; gas/mechanical is not a DIY path.


Get the project scope on drawings first


Unclear scope is how surprise costs get in the house. Ask past clients how close the bid was to the final number, and whether change orders came from owner wishes or holes in the documents. If the only person who will “start next week” will not put a license number, insurance, and a written scope in your hand, you do not have a contractor. You have a risk.


Talk to your building department before you start


Neighbors along the Nolichucky were still grinding through Helene recovery as of late March 2026 (WCYB). Fast is understandable. Fast-and-unpermitted is how you buy the job twice.


This is not a substitute for a local permit review. Call your building department — and if it is more than a cosmetic refresh, talk to a local architect — before you sign. The weather window is real. The permit window is realer.


Educational only. Confirm current codes, fees, and licensing with the jurisdiction that will issue your permit. Rules on the Virginia side of Bristol and in North Carolina are not the same as Tennessee’s.

Comments


Offices:

TENNESSEE

CALIFORNIA

Phone:

423.277.0187

805.457.5440 

Ready to Talk About Your Project?

© 2026 by MSA ARCHITECTS, INC. 
Powered and secured by Wix. 

bottom of page